Paper | Title | Page |
---|---|---|
MOPHA024 | A Novel Transverse Deflecting Cavity for Slice Diagnostics at BERLinPro | 827 |
|
||
Funding: Work supported by BMBF under contract no. 05K10PEA BERLinPro is an energy-recovery linac project to be realized at the Helmholtz-Zentrum Berlin (HZB) for an electron beam with 1mm mrad normalized emittance and 100 mA average current. The initial beam parameters are determined by the performance of the electron source, an SRF photo-electron injector. The development auf this SRF photon-electron injector is a main task of BERLinPro. Especially the beam emittance is basically defined by the SRF photogun. For beam diagnostics time dependent effects from the RF curvature and space charge must be taken into account and a sophisticated slice diagnostics is required. To perform this type of diagnostics a transverse deflecting cavity has been designed, characterized and is presently under construction.. This single cell cavity operates in a TM110-like mode at 1.3 GHz optimized for high transverse shuntimpedance of appr. 3.2 MOhm by a concentration of fields near the beam axis. The cavity has a novel geometry that allows for an operation with both polarizations of the TM110-Mode. The layout of the deflecting cavity will be presented together with the results of the low RF characterization. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPHA024 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPWA018 | Progress Report of the Berlin Energy Recovery Project BERLinPro | 1438 |
|
||
Funding: Work supported by German Bundesministerium für Bildung und Forschung, Land Berlin, and grants of Helmholtz Association The Helmholtz Zentrum Berlin is constructing the Energy Recovery Linac Project BERLinPro on its site in Berlin Adlershof. The project is intended to expand the required accelerator physics and technology knowledge mandatory for the design, construction and operation of future synchrotron light sources. The project goal is the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beamat 2~ps rms bunch duration or below. The planning phase of the project is completed and the design phase of most of the components is finished. Many of them have already been ordered. After some delay the construction of the building has started in February 2015. The status of the various subprojects as well as a summary of current and future activities will be given. Major project milestones and details of the project time line will be finally introduced. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPWA018 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |