Paper | Title | Page |
---|---|---|
TUPHA010 | Design of the NSLS-II Top Off Safety System | 1986 |
|
||
The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently under design. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA010 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |