Author: Job, P.K.
Paper Title Page
TUPHA010 Design of the NSLS-II Top Off Safety System 1986
 
  • R.P. Fliller, L. Doom, G. Ganetis, C. Hetzel, P.K. Job, Y. Li, T.V. Shaftan, S.K. Sharma, O. Singh, G.M. Wang, Z. Xia
    BNL, Upton, Long Island, New York, USA
 
  The NSLS-II accelerators finished commissioning in the fall of 2014, with beamline commissioning underway. Part of the design for the NSLS-II is to operate in top off mode. The Top Off Safety System (TOSS) is presently under design. In this report we discuss the Top Off Safety System design and implementation, along with the necessary tracking results and radiological calculations.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPHA010  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)