MOPWA058 |
Measurement Results of the Impedance of the RF-cavity at the RCS in J-PARC |
255 |
|
- Y. Shobuda, H. Harada, H. Hotchi
JAEA/J-PARC, Tokai-mura, Japan
|
|
|
The kicker impedance dominates at the RCS in J-PARC. Recently, we observe beam instabilities, which are not explained by the kicker. As a candidate causing the beam instability, the impedance of the RF-cavity is measured. The longitudinal impedance is measured by stretching a single-wire inside the cavity. On the other hand, the measurement of the transverse impedance is done by horizontally shifting the single-wire, due to the accuracy problem. The measured impedance is too low to explain the beam instability.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-MOPWA058
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTY003 |
Measurement of Momentum Spread of the Injection Beam with Longitudinal Tomography Method in the J-PARC RCS |
944 |
|
- M. Yoshimoto, H. Harada, H. Hotchi, M. Kinsho, P.K. Saha, F. Tamura, M. Yamamoto
JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
|
|
|
In the J-PARC RCS, the beam tuning toward the design output beam power of 1MW were started after the completing of the beam energy and beam current upgrades in the LINAC. One of the important issues to achieve the 1MW beam operation is the optimization of the injection beam from the LINAC. Due to the longitudinal beam tuning in the LINAC, the momentum spread of the injected beam into the RCS was measured with the longitudinal tomography method. Our longitudinal tomography tool had been developed using the simple algorithm with the Convolution Back-Projection (CBP) method for the beam storage mode of the RCS. Accordingly, we improved this tool to expand into the acceleration mode.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-MOPTY003
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUBB3 |
Recent Progress of J-PARC RCS Beam Commissioning - Toward Realizing the 1-MW Output Beam Power |
1346 |
|
- H. Hotchi
JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
|
|
|
Via a series of the injector linac upgrades in 2013 and 2014, the J-PARC RCS got all the design parameters. Thus the RCS is now in the final beam commissioning phase aiming for the 1-MW design output beam power. This paper presents the recent progress of the RCS beam commissioning, mainly focusing on our approaches to beam loss issues that appeared on the process of the beam power ramp-up.
|
|
|
Slides TUBB3 [2.299 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUBB3
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|