Author: Hahn, H.
Paper Title Page
TUPMA049 First Beam Commissioning at BNL ERL SRF Gun 1941
 
  • W. Xu, Z. Altinbas, S.A. Belomestnykh, I. Ben-Zvi, S. Deonarine, D.M. Gassner, H. Hahn, L.R. Hammons, T. Hayes, J.P. Jamilkowski, P. K. Kankiya, D. Kayran, N. Laloudakis, R.F. Lambiase, V. Litvinenko, L. Masi, G.T. McIntyre, K. Mernick, T.A. Miller, G. Narayan, D. Phillips, V. Ptitsyn, T. Rao, T. Seda, F. Severino, B. Sheehy, K.S. Smith, A.N. Steszyn, T.N. Tallerico, R. Than, J.E. Tuozzolo, E. Wang, D. Weiss, M. Wilinski, A. Zaltsman
    BNL, Upton, Long Island, New York, USA
  • S.A. Belomestnykh, I. Ben-Zvi, V. Litvinenko, V. Ptitsyn
    Stony Brook University, Stony Brook, USA
 
  Funding: This work is supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. DOE.
The 704 MHz superconducting RF gun successfully generated the first photoemission beam on Nov. 17 2014. This paper will report the latest results of SRF beam commissioning, including the SRF cavity performance, cathode QE measurements, and beam parameter measurements. The beam commissioning setup is described in the paper as well.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPMA049  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPWI054 Design and Test of the RHIC CMD10 Abort Kicker 3612
 
  • H. Hahn, M. Blaskiewicz, K.A. Drees, W. Fischer, W. Meng, J.-L. Mi, C. Montag, C. Pai, J. Sandberg, N. Tsoupas, J.E. Tuozzolo, W. Zhang
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
Planned and unplanned thyratron pre-fire triggered beam dumps have been observed in the yellow ring that were associated with quenches of the superconducting main ring magnets as the proton intensities increased in the FY1013 run. The increasing vacuum level indicated beam induced kicker ferrite heating causing lower magnetic kick field at a nominal pulse current. In anticipation of higher current and shorter bunches in FY2015 an accelerator improvement program was initiated to reduce the longitudinal coupling impedance with changes to the eddy-current strip geometry using Opera simulations and to change the CMD5005 to CMD10 ferrite. Results of the standard impedance measurements and of pulse current in heating tests to 170 °C are reported. All 10 dump kickers are being modified and are encapsulated with a cooling system for installation in the rings.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPWI054  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)