Paper |
Title |
Page |
WEPMA015 |
Water-cooled Thin Walled Beam Pipes of the Fast Ramping Storage Ring ELSA |
2780 |
|
- P. Hänisch, W. Hillert, B. Neff
ELSA, Bonn, Germany
|
|
|
At the Electron Stretcher Facility ELSA of Bonn University thin walled beam pipes are in use to reduce eddy current loss to a minimum. The operation of the accelerator places high demands on the beam pipes like static stress because of the inner vacuum and additional one-sided thermal stress caused by synchrotron radiation. A first generation of thin walled beam pipes had been developed and manufactured during the construction of the stretcher ring in 1985. These pipes were successfully in operating stage the following ten years. The beam pipes had a wall thickness of 0.3mm, a length of 3m, and a bending radius of ca. 10.5m. Special pipes with a sideway branch for synchrotron radiation experiments have been manufactured in the same assembly dimension. In the course of an intensity upgrade, a second generation of beam pipes has been developed in 1995. To reduce the thermal stress caused by the synchrotron radiation an internal water cooling was mounted. In this contribution the design and manufacturing principles of the thin walled beam pipes with water cooling are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMA015
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMA016 |
A New RF station for the ELSA Stretcher Ring |
2783 |
|
- M. Schedler, A. Dieckmann, P. Hänisch, W. Hillert
ELSA, Bonn, Germany
|
|
|
At the Electron Stretcher Facility ELSA of Bonn University, an increase of the maximum stored beam current from 20 mA to 200 mA is planned. The storage ring operates applying a fast energy ramp of 6 GeV/s from 1.2 GeV to 3.2 GeV and afterwards a slow extraction over a few seconds to the hadron physics experiments. The beam current is mainly limited due to missing RF power at highest energies in order to compensate for synchrotron radiation losses. The current stretcher ring's RF station is based on a single 200 kW klystron driving two 5-cell PETRA type cavities. To achieve the desired beam current at maximum energy two additional 7-cell PETRA type cavities, drivin by a second klystron, will be installed. With this upgrade, sufficient beam lifetime for slow beam extraction will be provided and thus ensure an adequate duty cycle of the external beam current. The general setup of the new RF station as well as the changes in operation when switching from one to two stations will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMA016
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|