Author: Grebenyuk, J.
Paper Title Page
MOPWA042 Sub-fs Electron Bunch Generation Using Magnetic Compressor at SINBAD 207
 
  • J. Zhu, R.W. Aßmann, U. Dorda, J. Grebenyuk, B. Marchetti
    DESY, Hamburg, Germany
 
  In order to achieve high quality electron beams by laser-driven plasma acceleration with external injection, sub-fs bunches with a few fs arrival-time jitter are required. SINBAD (Short Innovative Bunches and Accelerators at DESY) is a proposed dedicated accelerator research and development facility at DESY. One of the baseline experiment at SINBAD is ARES (Accelerator Research Experiment at SINBAD), which will provide ultra-short electron bunches of 100 MeV to one or two connected beam lines. We present start-to-end simulation studies of sub-fs bunches generation at ARES using a magnetic compressor with a slit. In addition, the design of a dogleg with tunable R56 for the second beamline is also presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPWA042  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPWA029 ARES: Accelerator Research Experiment at SINBAD 1469
 
  • B. Marchetti, R.W. Aßmann, C. Behrens, R. Brinkmann, U. Dorda, K. Flöttmann, J. Grebenyuk, M. Hüning, Y.C. Nie, H. Schlarb, J. Zhu
    DESY, Hamburg, Germany
 
  ARES is a planned linear accelerator for R&D for production of ultra-short electron bunches. It will be hosted at the SINBAD facility, at DESY in Hamburg*. The goal of ARES is to produce low charge (0.2-50pC), ultra-short (from few fs to sub-fs) bunches, with high arrival time stability (less than 10fs) for various applications, such as external injection for Laser Plasma Wake-Field acceleration**. The baseline layout of the accelerator foresees an S-band photo-injector which compresses low charge electron bunches via velocity bunching and accelerates them to 100 MeV energy. In the second stage, it is planned to install a third S-band accelerating cavity to reach 200 MeV as well as two X-band cavities: One for the linearization of the longitudinal phase space (subsequently allowing an improved bunch compression) and another one as a transverse deflecting cavity for longitudinal beam diagnostics. Moreover a magnetic bunch compressor is envisaged allowing to cut out the central slice of the beam*** or hybrid bunch compression.
* R. Assmann et al., TUPME047, Proceedings of IPAC 2014.
** R. Assmann, J. Grebenyuk, TUOBB01, Proceedings of IPAC 2014.
*** P. Emma et al., PRL 92 7 (2004).
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPWA029  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPWA030 Compression of an Electron-bunch by Means of Velocity Bunching at ARES 1472
 
  • B. Marchetti, R.W. Aßmann, U. Dorda, J. Grebenyuk, J. Zhu
    DESY, Hamburg, Germany
 
  ARES is a planned linear accelerator for research and development in the field of production of ultra-short electron bunches. The goal of ARES is to produce low charge (0.2-50pC), ultra-short (from few fs to sub-fs) bunches, with improved arrival time stability (less than 10fs) for various applications, such as external injection for Laser Plasma Wake-Field acceleration. The ARES layout will allow to perform and compare different kind of conventional e-bunch compression techniques, such as pure velocity bunching*, hybrid velocity bunching (i.e. velocity bunching plus magnetic compression) and pure magnetic compression with the slit insertion**. This flexibility will allow to directly compare the different methods in terms of arrival time stability and local peak current. In this paper we present simulation results for the compression of an electron bunch with 0.5 pC charge. We compare the case of pure velocity bunching compression to the one of a hybrid compression using velocity bunching plus a magnetic compressor.
* M. Ferrario et al., Phys. Rev. Lett. 104, 054801 (2010).
** P. Emma et al., PRL 92 7 (2004).
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPWA030  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPWA003 Simulations of Electron-Proton Beam Interaction before Plasma in the AWAKE Experiment 2492
 
  • U. Dorda, R.W. Aßmann, J. Grebenyuk
    DESY, Hamburg, Germany
  • C. Bracco, A.V. Petrenko, J.S. Schmidt
    CERN, Geneva, Switzerland
 
  The on-axis injection of electron bunches in the proton-driven plasma wake at the AWAKE experiment at CERN implies co-propagation of a low-energy electron beam with the long high-energy proton beam in a common beam pipe over several meters upstream of the plasma chamber. The possible effects of the proton-induced wakefields on the electron bunch phase space in the common beam pipe region may have crucial implications for subsequent electron trapping and acceleration in plasma. We present the CST Studio simulations of the tentative common beam pipe setup and the two beam co-propagating in it. Simulated effects of the proton wakefields on electrons are analysed and compared to analytical predictions.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPWA003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMA031 Timing Jitter Studies for sub-fs Electron Bunch Generation at SINBAD 2826
 
  • J. Zhu, R.W. Aßmann, U. Dorda, J. Grebenyuk, B. Marchetti
    DESY, Hamburg, Germany
 
  Generation of ultra-short electron bunches with a few femtoseconds arrival-time jitter is the major challenge in plasma acceleration with external injection. Meanwhile, peak current stability is also one of the crucial factors for user experiments when the electron bunch is used for free-electron laser (FEL) generation. ARES (Accelerator Research Experiment at SINBAD) will consist of a compact S-band normal-conducting photo-injector providing ultra-short electron bunches of 100 MeV. We present bunch arrival-time jitter studies for two different compression schemes, velocity bunching and magnetic compression with a slit, at ARES with start-to-end simulations. Contributions from various jitter sources are quantified.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-WEPMA031  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)