THPF090 Status and Plans for the Upgrade of the CERN PS Booster 3905
 
  • K. Hanke, D. Aguglia, M.E. Angoletta, W. Bartmann, C. Bedel, E. Benedetto, S. Bertolasi, C. Bertone, J. Betz, T.W. Birtwistle, A. Blas, J. Borburgh, C. Bracco, A.C. Butterworth, E. Carlier, S. Chemli, P. Dahlen, A. Dallocchio, G.P. Di Giovanni, T. Dobers, A. Findlay, R. Froeschl, A. Funken, S. Gabourin, J.L. Grenard, D. Grenier, J. Hansen, D. Hay, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Martin, A. Masi, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, M.R. Obrecht, M.M. Paoluzzi, S. Pittet, B. Puccio, J. Tan, J. Vollaire, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. More work is planned for the upcoming end-of-year technical stops, notably in 2016/17, while most of the upgrade is planned to take place during the second long LHC shutdown (LS2). We report on the upgrade items already completed and commissioned, the first Run 2 beam performance and give a status of the ongoing design and integration work.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF090  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPF093 Status of the LHC Injectors Upgrade (LIU) Project at CERN 3915
 
  • M. Meddahi, J. Coupard, H. Damerau, A. Funken, S.S. Gilardoni, B. Goddard, K. Hanke, L. Kobzeva, A.M. Lombardi, D. Manglunki, S. Mataguez, B. Mikulec, G. Rumolo, E.N. Shaposhnikova, M. Vretenar
    CERN, Geneva, Switzerland
 
  CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in order to enable the delivery of beams with the challenging HL-LHC parameters. The LHC Injectors Upgrade project coordinates this massive upgrade program, and covers a new linac (Linac4 project) as well as upgrades to the Proton Synchrotron Booster, the Proton Synchrotron and Super Proton Synchrotron. The heavy ion injector chain is also included, adding the Linac3 and Low Energy Ion Ring to the list of accelerators concerned. The performance objectives and roadmap of the main upgrades will be presented, including the work status and outlook. The machine studies and milestones during LHC Run 2 will be discussed and a preliminary Long Shutdown 2 installation planning given. Finally, for the LHC Run 3, the beam performance across the full injector chain after all the upgrades will be estimated and the required commissioning stages outlined.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF093  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)