MOPHA010 RF Feedback and Detuning Studies for the BESSY Variable Pulse Length Storage Ring Higher Harmonic SC Cavities 798
 
  • A. Neumann, P. Echevarria, P. Goslawski, M. Ries, M. Ruprecht, A.V. Vélez, G. Wüstefeld
    HZB, Berlin, Germany
 
  For the feasibility of the BESSY VSR upgrade project of BESSY II two higher harmonic systems at a factor of 3 and 3.5 of the ring's RF fundamental of 500 MHz will be installed in the ring. Operating in continuous wave at high average accelerating field of 20 MV/m and phased at zero-crossing, the superconducting cavities have to be detuned within tight margins to ensure stable operation and low power consumption at a loaded Q of 5·107. The field variation of the cavities is mainly driven by the repetitive transient beam-loading of the envisaged complex bunch fill pattern in the ring. Within this work combined LLRF-cavity and longitudinal beam dynamics simulation will demonstrate the limits for stable operation, especially the coupling between synchrotron oscillation and RF feedback settings. Further impact by beam current decay and top-up injection shots are being simulated.
* G. Wüstefeld et al., IPAC 11, San Sebastiàn, Spain, p. 2936.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPHA010  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPWA018 Progress Report of the Berlin Energy Recovery Project BERLinPro 1438
 
  • M. Abo-Bakr, W. Anders, K.B. Bürkmann-Gehrlein, A. Burrill, A.B. Büchel, P. Echevarria, A. Frahm, H.-W. Glock, A. Jankowiak, C. Kalus, T. Kamps, G. Klemz, J. Knobloch, J. Kolbe, J. Kühn, O. Kugeler, B.C. Kuske, P. Kuske, A.N. Matveenko, A. Meseck, R. Müller, A. Neumann, N. Ohm, K. Ott, E. Panofski, F. Pflocksch, D. Pflückhahn, J. Rahn, J. Rudolph, M. Schmeißer, O. Schüler, J. Völker
    HZB, Berlin, Germany
 
  Funding: Work supported by German Bundesministerium für Bildung und Forschung, Land Berlin, and grants of Helmholtz Association
The Helmholtz Zentrum Berlin is constructing the Energy Recovery Linac Project BERLinPro on its site in Berlin Adlershof. The project is intended to expand the required accelerator physics and technology knowledge mandatory for the design, construction and operation of future synchrotron light sources. The project goal is the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beamat 2~ps rms bunch duration or below. The planning phase of the project is completed and the design phase of most of the components is finished. Many of them have already been ordered. After some delay the construction of the building has started in February 2015. The status of the various subprojects as well as a summary of current and future activities will be given. Major project milestones and details of the project time line will be finally introduced.
 