THPF116 PIP-II Status and Strategy 3982
 
  • S.D. Holmes, P. Derwent, V.A. Lebedev, C.S. Mishra, D.V. Mitchell, V.P. Yakovlev
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by the Fermi Research Alliance under U.S. Department of Energy contract number DE-AC02-07CH11359
Proton Improvement Plan-II (PIP-II) is the centerpiece of Fermilab’s plan for upgrading the accelerator complex to establish the leading facility in the world for particle physics research based on intense proton beams. PIP-II has been developed to provide 1.2 MW of proton beam power at the start of operations of the Long Baseline Neutrino Experiment (LBNE), while simultaneously providing a platform for eventual extension of LBNE beam power to >2 MW and enabling future initiatives in rare processes research based on high duty factor/higher beam power operations. PIP-II is based on the construction of a new, 800 MeV, superconducting linac, augmented by improvements to the existing Booster, Recycler, and Main Injector complex. PIP-II is currently in the development stage with an R&D program underway targeting the front end and superconducting rf acceleration technologies. This paper will describe the status of the PIP-II conceptual development, the associated technology R&D programs, and the strategy for project implementation.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF116  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)