Lessons Learned From the First Long Shutdown of the Lhc and Its Injector Chain |
2050 |
|
- K. Foraz, M.B.M. Barberan Marin, M. Bernardini, J. Coupard, N. Gilbert, D. Hay, S. Mataguez, D.J. Mcfarlane, E. Vergara Fernandez
CERN, Geneva, Switzerland
|
|
|
The First Long Shutdown (LS1) of the LHC and its Injector chain, which started in February 2013, was completed by the first quarter 2015. A huge number of activities have been performed; this paper reviews the process of the coordination of LS1 from the preparatory phase to the testing phase. The preparatory phase is a very important process: an accurate view of what is to be done, and what can be done is essential. But reality is always different, the differences between what was planned and what was done will be described. The paper will recall the coordination, reporting and decisional processes, highlighting points of success and points to be improved in terms of general coordination, in-situ coordination, safety coordination, logistics and resource management.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPTY023
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF093 |
Status of the LHC Injectors Upgrade (LIU) Project at CERN |
3915 |
|
- M. Meddahi, J. Coupard, H. Damerau, A. Funken, S.S. Gilardoni, B. Goddard, K. Hanke, L. Kobzeva, A.M. Lombardi, D. Manglunki, S. Mataguez, B. Mikulec, G. Rumolo, E.N. Shaposhnikova, M. Vretenar
CERN, Geneva, Switzerland
|
|
|
CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in order to enable the delivery of beams with the challenging HL-LHC parameters. The LHC Injectors Upgrade project coordinates this massive upgrade program, and covers a new linac (Linac4 project) as well as upgrades to the Proton Synchrotron Booster, the Proton Synchrotron and Super Proton Synchrotron. The heavy ion injector chain is also included, adding the Linac3 and Low Energy Ion Ring to the list of accelerators concerned. The performance objectives and roadmap of the main upgrades will be presented, including the work status and outlook. The machine studies and milestones during LHC Run 2 will be discussed and a preliminary Long Shutdown 2 installation planning given. Finally, for the LHC Run 3, the beam performance across the full injector chain after all the upgrades will be estimated and the required commissioning stages outlined.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF093
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|