Author: Busch, M.
Paper Title Page
THPF021 Structural, Mechanical and RF Measurements on the Superconducting 217 MHz CH Cavity for the CW Demonstrator at GSI 3730
 
  • F.D. Dziuba, M. Amberg, M. Basten, M. Busch, H. Podlech
    IAP, Frankfurt am Main, Germany
  • M. Amberg, K. Aulenbacher, W.A. Barth, S. Mickat
    HIM, Mainz, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • W.A. Barth, S. Mickat
    GSI, Darmstadt, Germany
 
  Funding: Work supported by HIM, GSI, BMBF Contr. No. 05P12RFRBL
Together with the new horizontal cryomodule and two superconducting (sc) 9.5 T solenoids the sc 217 MHz Crossbar-H-mode (CH) cavity represents the continuous wave (cw) demonstrator and brings sc rf technology to GSI. A reliable operability of the sc CH cavity is one major goal of the demonstrator project. Furthermore, the successful beam operation of the demonstrator will be a milestone on the way to a new sc cw linac at GSI for a competitive production of Super Heavy Elements (SHE) in the future. The production of the cryomodule and the solenoids is almost finished while the cavity has been completed except for the helium vessel. In this paper structural mechanical as well as related rf measurements on the sc 217 MHz CH cavity are presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-THPF021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)