TUPWI001 |
Turnkey Systems Cost Optimization by Iterative Design of Magnets and Power Supplies |
2239 |
|
- M. Cavellier, W. Beeckman, F. Forest, J.D. Holzmann
Sigmaphi, Vannes, France
|
|
|
For more than 30 years, Sigmaphi has been manufacturing magnets and power supplies. Its teams are now able to supply a complete particle beam line, from beam optics calculation to on-site installation and alignment. These combined skills allow design optimization for turnkey systems in order to reduce their purchasing and running costs. An example of successful iterative design is presented: a 70 meters beam line designed, manufactured and installed by Sigmaphi for JINR in Dubna, Russia. This design optimization allowed reducing total power consumption of the 14 quadrupoles by 7.5%.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-TUPWI001
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPF034 |
Injection Kicker for HESR at FAIR using Semi-Conductor Switches |
3770 |
|
- R. Tölle, N. Bongers, F.M. Esser, R. Gebel, S. Hamzic, H. Jagdfeld, F. Klehr, B. Laatsch, L. Reifferscheidt, M. Retzlaff, L. Semke, H. Soltner, H. Stockhorst
FZJ, Jülich, Germany
- S. Antoine, W. Beeckman, P. Bocher, O. Cosson, P. Jivkov, D. Ramauge
Sigmaphi, Vannes, France
|
|
|
The High Energy Storage Ring for Antiprotons is going to be built at FAIR in Darmstadt on the extended GSI campus. It will receive the antiprotons via the Collector Ring (CR). Using a barrier bucket, the circulating particles will be compressed into one half of the circumference. New particles have to be injected into the remaining half. Thus rise and fall time must not exceed 220 ns each with a flat top of 500 ns. A kick angle of 6.4 mrad is required at 13 Tm magnetic rigidity. The system must allow pole reversal for injection of positively charged particles. With a voltage lower than 40 kV a semi-conductor based pulser is going to be realized. Boundary conditions and the status of preparatory work are described. Simulation results and available measurements are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2015-THPF034
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|