Author: Apollonio, M.
Paper Title Page
TUPJE061 Injection Studies for the Diamond Storage Ring 1768
 
  • I.P.S. Martin, M. Apollonio, R. Bartolini
    DLS, Oxfordshire, United Kingdom
  • R. Bartolini
    JAI, Oxford, United Kingdom
 
  The Diamond storage ring will be upgraded during 2016 by replacing one of the existing double bend achromat (DBA) cells with a double-DBA (DDBA) cell*. It is anticipated that both the on and off momentum dynamic aperture will reduce as a result of this change. In order to prepare for this eventuality, injection into the Diamond storage ring has been recently studied in detail. In particular, the oscillation amplitude, angle and energy of the injected beam have been determined, along with the position of the stored beam with respect to the septum plate. Following these studies, the injected beam energy has been matched to the storage ring, and plans have been put in place to move the injection septum 4 mm closer to the stored beam centre line.
*R.P. Walker et al., “The Double-Double Bend Achromat (DDBA) Lattice Modification for the Diamond Storage Ring”, Proc. IPAC 2014, MOPRO103, (2014)
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPJE061  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPJE062 First Transparent Realignment Tests at the Diamond Storage Ring 1772
 
  • M. Apollonio, R. Bartolini, P. Dudin, M. Hoesch, W.J. Hoffman, E.C. Longhi, A.J. Rose, A. Thomson
    DLS, Oxfordshire, United Kingdom
  • R. Bartolini
    JAI, Oxford, United Kingdom
 
  The Transparent Realignment of the Diamond Storage Ring is a program of work to improve the mechanical alignment of the machine by carefully moving the magnet girders with a virtually zero impact on the associated beamlines. The girders can be moved by means of a 5-axis motion system under remote control via the EPICS toolkit from the Diamond Control Room. Currently three cells (three girders in each) have been equipped with a permanent protection system to prevent excessive deflection across each of the inter-girder vacuum bellows. The protection and motion systems are installed in the associated Control and Instrumentation Area (CIA). Full commissioning of the motion and protection systems have been completed. Results from the alignment test sessions are hereby reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPJE062  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)