Author: Abo-Bakr, M.
Paper Title Page
MOPWA018 Loss Factor and Impedance Analysis of Warm Components of BERLinPro 128
 
  • H.-W. Glock, M. Abo-Bakr, J. Kolbe, F. Pflocksch, A. Schälicke
    HZB, Berlin, Germany
  • H.-W. Glock, C. Potratz
    COMPAEC e.G., Rostock, Germany
 
  Funding: Work supported by German Bundesministerium für Bildung und Forschung, Land Berlin, and grants of Helmholtz Association
The ongoing component design for the HZB 50 MeV, 100mA ERL project BERLinPro is accompanied by loss factor and impedance computations. A list of accelerator components including bellows, collimators, tapers, shutter valves etc. is given, some of them with alternative shapes. Loss factors, calculated using CSTParticleStudio®, are presented together with important properties of the impedance spectrum. Scaling of the loss factors with respect to bunch length is calculated on base of the numerical simulations and is used to extrapolate down to a bunch length (1 standard deviation) of 0.6 mm, which is hard to reach directly in numerical simulations.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-MOPWA018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPWA018 Progress Report of the Berlin Energy Recovery Project BERLinPro 1438
 
  • M. Abo-Bakr, W. Anders, K.B. Bürkmann-Gehrlein, A. Burrill, A.B. Büchel, P. Echevarria, A. Frahm, H.-W. Glock, A. Jankowiak, C. Kalus, T. Kamps, G. Klemz, J. Knobloch, J. Kolbe, J. Kühn, O. Kugeler, B.C. Kuske, P. Kuske, A.N. Matveenko, A. Meseck, R. Müller, A. Neumann, N. Ohm, K. Ott, E. Panofski, F. Pflocksch, D. Pflückhahn, J. Rahn, J. Rudolph, M. Schmeißer, O. Schüler, J. Völker
    HZB, Berlin, Germany
 
  Funding: Work supported by German Bundesministerium für Bildung und Forschung, Land Berlin, and grants of Helmholtz Association
The Helmholtz Zentrum Berlin is constructing the Energy Recovery Linac Project BERLinPro on its site in Berlin Adlershof. The project is intended to expand the required accelerator physics and technology knowledge mandatory for the design, construction and operation of future synchrotron light sources. The project goal is the generation of a high current (100 mA), high brilliance (norm. emittance below 1 mm mrad) cw electron beamat 2~ps rms bunch duration or below. The planning phase of the project is completed and the design phase of most of the components is finished. Many of them have already been ordered. After some delay the construction of the building has started in February 2015. The status of the various subprojects as well as a summary of current and future activities will be given. Major project milestones and details of the project time line will be finally introduced.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2015-TUPWA018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)