Title |
Status of the ESS Accelerator Construction Project |
Authors |
- M. Lindroos, H. Danared, R. Garoby, D.P. McGinnis, E. Tanke
ESS, Lund, Sweden
|
Abstract |
The European spallation source is now under construction just outside in Lund in Sweden. The driver is a 5 MW linac operating at a duty factor of 4% and at 2 GeV. The detailed design of the buildings is just being completed, and the casting of the accelerator tunnel has started. The accelerator design is getting mature with the major parts under prototyping. A challenging aspect of the project is the large percentage of in-kind contributions. For the accelerator this is now reaching 47% percent in pre commitments by institutes and universities in the ESS member states. We will in this paper give an overview of the ESS accelerator design, the status of prototyping and the organization of the in-kind accelerator construction project.
|
Paper |
download THPF080.PDF [0.445 MB / 3 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2015, Richmond, VA, USA |
Series |
International Particle Accelerator Conference (6th) |
Proceedings |
Link to full IPAC2015 Proccedings |
Session |
Thursday Posters |
Date |
07-May-15 16:00–18:00 |
Main Classification |
4: Hadron Accelerators |
Sub Classification |
A14 - Neutron Spallation Facilities |
Keywords |
target, klystron, linac, proton, beam-transport |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Stuart Henderson (ANL, Argonne, IL, USA); Evelyn Akers (Jlab, Newport News, VA, USA); Todd Satogata (JLab, Newport News, VA, USA); Volker R.W. Schaa (GSI, Darmstadt, Germany) |
ISBN |
978-3-95450-168-7 |
Published |
June 2015 |
Copyright |
|