Paper | Title | Page |
---|---|---|
MOPRI084 | Beam Dynamic into the Transfer RIB Lines to the DESIR Facility at GANIL-SPIRAL2 | 806 |
|
||
Funding: French ANR, Investissements d'Avenir, EQUIPEX Contract number ANR-11-EQPX-0012 The new ISOL facility SPIRAL2 is currently being built at GANIL, Caen France. SPIRAL2 will produce a large number of new radioactive ion beams (RIB) at high intensities. The DESIR facility will receive beams from the upgraded SPIRAL1 facility of GANIL (stable beam and target fragmentation), from the S3 Low Energy Branch (fusion-evaporation and deep-inelastic reactions) and from the SPIRAL2 production cave (n-induced fission of 238U, nucleon transfer and fusion-evaporation reactions). In order to deliver the RIB to the experimental set-ups installed in the DESIR hall, 110 meters of beam line have to be designed, originating from 3 different facilities. This paper will focus on the studies which have been done on these transfer lines: beam optics and errors calculations, quadrupoles, diagnostics and mechanical designs. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRI084 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUOAA02 | Design of the LBNE Beamline | 907 |
|
||
Funding: DOE, contract No. DE-AC02-07CH11359 The Long Baseline Neutrino Experiment (LBNE) will utilize a beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a wide band beam of neutrinos toward a detector placed at the Sanford Underground Research Facility in South Dakota, about 1,300 km away. The main elements of the facility are a primary proton beamline and a neutrino beamline. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab’s Main Injector. Neutrinos are produced after the protons hit a solid target and produce mesons which are subsequently focused by a set of magnetic horns into a 204 m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be ~1.2 MW, however the facility is designed to be upgradeable for 2.3 MW operation. We discuss here the status of the design and the associated challenges. |
||
![]() |
Slides TUOAA02 [5.781 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUOAA02 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |