TUPRO043 Status and Computer Simulations for the Front End of the Proton Injector for Fair 1120
 
  • C. Ullmann, R. Berezov, J. Fils, R. Hollinger, V. Ivanova, O.K. Kester, W. Vinzenz
    GSI, Darmstadt, Germany
  • N. Chauvin, O. Delferrière
    CEA/IRFU, Gif-sur-Yvette, France
 
  FAIR - the international facility for antiproton and ion research – located at GSI in Darmstadt, Germany is one of the largest research projects worldwide. It will provide an antiproton production rate of 7·1010 cooled pbars per hour, which is equivalent to a primary proton beam current of 2·1016 protons per hour. A high intensity proton linac (p-linac) will be built, with an operating rf-frequency of 325 MHz to accelerate a 70 mA proton beam up to 70 MeV, using conducting crossed-bar H-cavities. The repetition rate is 4 Hz with an ion beam pulse length of 36 μs[1]. Developed within a joint French-German collaboration - GSI/CEA-SACLAY/IAP – the compact proton linac will be injected by a microwave ion source and a low energy beam transport (LEBT). The 2.45 GHz ion source allows high brightness ion beams at an energy of 95 keV and will deliver a proton beam current of 100 mA at the entrance of the RFQ (Radio Frequency Quadrupole) within an emittance of 0.3π mm mrad (rms). To check on these parameters computer simulations with TraceWin, IGUN and IBSIMU of the ion extraction and LEBT (Low Energy Beam Transport) are performed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO043  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPME063 Pulsed Low Level Baseband RF Control of CH-Cavities for p-Linac at FAIR 2421
 
  • P. Nonn, U. Bonnes, C. Burandt, F. Hug, N. Pietralla
    TU Darmstadt, Darmstadt, Germany
  • H. Klingbeil, G. Schreiber, W. Vinzenz
    GSI, Darmstadt, Germany
  • H. Klingbeil
    TEMF, TU Darmstadt, Darmstadt, Germany
 
  Funding: This project was supported by the BMBF under grant No. 05P09RDRB5 and by the Helmholtz International Center for FAIR (HIC for FAIR) funded by the State of Hesse within its LOEWE initiative.
At the Facility for Antiproton and Ion Research (FAIR) in Darmstadt, Germany a high intensity antiproton beam will be produced. To provide the necessary 70 mA proton beam a dedicated proton linac (p-Linac) is under construction. The main acceleration will be provided by 9 novel CH-type cavities, of which 6 will be coupled in pairs to share the same klystron. To test the rf properties of these novel cavities, a test stand is under construction. An rf control system for the pulsed operation of these cavities has been developed at TU Darmstadt. It is based upon the digital cw rf control that is successfully in operation as part of the S-DALINAC at IKP Darmstadt. The latest developments will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPME063  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPME011 First Coupled CH Power Cavity for the FAIR Proton Injector 3232
 
  • R. M. Brodhage, G. Clemente, W. Vinzenz
    GSI, Darmstadt, Germany
  • R. M. Brodhage, U. Ratzinger
    IAP, Frankfurt am Main, Germany
 
  For the research program with cooled antiprotons at FAIR a dedicated 70 MeV, 70 mA proton injector is required. The main acceleration of this room temperature linac will be provided by six CH cavities operated at 325 MHz. Each cavity will be powered by a 2.5 MW Klystron. For the second acceleration unit from 11.5 MeV to 24.2 MeV a 1:2 scaled model has been built. Low level RF measurements have been performed to determine the main parameters and to prove the concept of coupled CH cavities. In 2012, the assembly and tuning of the first power prototype was finished. Until then, the cavity was tested with a preliminary aluminum drift tube structure, which was used for precise frequency and field tuning. In 2013 the final drift tube structure has been welded inside the main tanks and the preparation for copper plating has taken place. This paper will report on the main tuning and commissioning steps towards that novel type of DTL and it will show the latest results measured on a fully operational CH proton cavity shortly before copper plating.  