Author: Sun, X.J.
Paper Title Page
TUPRO095 Using One-dimensional Hall Probe to Measure the Solenoid Magnet for CSNS/RCS 1262
 
  • Z. Zhang, S. Li, F. Long, X.J. Sun
    IHEP, Beijing, People's Republic of China
 
  Abstract CSNS(China Spallation Neutron Source) construction is expected to start in 2010 and will last 6.5 years. A long beam transport line is followed with the DTL linac to send the beam a rapid cycling synchrotron (RCS) accelerator. The beam will be focused by the solenoid magnet. This magnet will be located in LEBT system. It has been used with one-dimensional Hall probe to measurement by Institute of High Energy Physics, China. After the measurement, the measurement results meet the design requirements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO095  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)