Author: Santucci, J.K.
Paper Title Page
WEPRI058 Commissioning Status of the Advanced Superconducting Test Accelerator at Fermilab 2615
 
  • J. Ruan, R. Andrews, C.M. Baffes, D.R. Broemmelsiek, K. Carlson, B. Chase, M.D. Church, D.J. Crawford, E. Cullerton, J.S. Diamond, N. Eddy, D.R. Edstrom, E.R. Harms, A. Hocker, A.S. Johnson, A.L. Klebaner, M.J. Kucera, J.R. Leibfritz, A.H. Lumpkin, J.N. Makara, S. Nagaitsev, O.A. Nezhevenko, D.J. Nicklaus, L.E. Nobrega, P.S. Prieto, J. Reid, J.K. Santucci, G. Stancari, D. Sun, M. Wendt, S.J. Wesseln
    Fermilab, Batavia, Illinois, USA
  • P. Piot
    Northern Illinois University, DeKalb, Illinois, USA
 
  Funding: *Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
The Advanced Superconducting Test Accelerator (ASTA) is under construction at Fermilab. This accelerator will consist of a photo-electron gun, injector, ILC-type cryomodules, and multiple downstream beam-lines. Its purpose is to be a user-based facility for Advanced Accelerator R&D. . Following the successful commissioning of the photoinjector gun, a Tesla style 8-cavity cryomodule and a high gradient capture cavity have been cooled down to 2 K and powered commissioning and performance characterization has begun. We will report on the commissioning status and near-term future plans for the facility.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRI058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRI059 Assembly and Installation of the UV Laser Delivery and Diagnostic Platform and the Photocathode Imaging System for the ASTA Front-end 2618
 
  • D.J. Crawford, R. Andrews, T.W. Hamerla, J. Ruan, J.K. Santucci, D. Snee
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was supported by the Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy.
The Advanced Superconducting Test Accelerator (ASTA) is in the early stage of commissioning. The Front-End consists of a 1.5 cell normal conducting RF Gun resonating at 1.3 GHz with a gradient of up to 40 MV/m, a cesium telluride cathode for photoelectron production, a pulsed 264 nm ultra-violet (UV) laser delivery system, and a diagnostic area for measuring the characteristics of the photoelectron beam. We report on the design, construction, and early experience of the ultra-violet (UV) Laser Delivery and Diagnostic Platform and the Photocathode Imaging System.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRI059  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPME193 GUI Development for the Drive Laser at Fermilab's ASTA Facility 3735
 
  • D.R. Edstrom, E.R. Harms, T.R. Johnson, A.H. Lumpkin, J. Ruan, J.K. Santucci
    Fermilab, Batavia, Illinois, USA
 
  A comprehensive set of graphical user interfaces is being developed for the drive laser of the Advanced Superconducting Test Accelerator (ASTA) facility at Fermilab. These interfaces have been designed in Synoptic, a Java-based GUI development platform with credential-dependent access to the Fermilab accelerator controls network. Such implementation facilitates the user's ability to monitor and control many aspects of the drive laser system in an intuitive environment, as well as timely updates on the part of the developers made necessary by the evolving drive laser system. Furthermore, the current interface hierarchy readily allows integration into the larger pool of Synoptic applications being developed for other subsystems at ASTA.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPME193  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)