Author: Long, F.
Paper Title Page
TUPRO095 Using One-dimensional Hall Probe to Measure the Solenoid Magnet for CSNS/RCS 1262
 
  • Z. Zhang, S. Li, F. Long, X.J. Sun
    IHEP, Beijing, People's Republic of China
 
  Abstract CSNS(China Spallation Neutron Source) construction is expected to start in 2010 and will last 6.5 years. A long beam transport line is followed with the DTL linac to send the beam a rapid cycling synchrotron (RCS) accelerator. The beam will be focused by the solenoid magnet. This magnet will be located in LEBT system. It has been used with one-dimensional Hall probe to measurement by Institute of High Energy Physics, China. After the measurement, the measurement results meet the design requirements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO095  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYB01 Status and Trends in Magnet Power Converter Technology for Accelerators 2822
 
  • F. Long
    IHEP, Beijing, People's Republic of China
 
  Power converters (PC) is one of the key technologies for accelerators. During recent years with the development of power semiconductor devices, optimization of topologies, and improvement of manufacturing, the voltage and current ratings and power densities have greatly increased for PCs. Various PCs are required for various magnets in accelerators, but in principle the design for main topologies and the methodology for stabilizing the output are similar. Main topologies, digital control systems,and considerations for the future about the magnet PC are briefly discussed in this presentation.  
slides icon Slides THYB01 [2.477 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THYB01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)