Author: Lin, P.A.
Paper Title Page
THPRI098 Brazing and Helium Leaking Test for High Heat Load Components in the Taiwan Photon Source 4004
 
  • P.A. Lin, C.K. Kuan, T.Y. Lee, H.Y. Lin, I.C. Sheng
    NSRRC, Hsinchu, Taiwan
 
  Taiwan Photon Source is the second accelerator constructed by National Synchrotron Radiation Research Center (NSRRC). With 3GeV, 500mA, this facility will generate extremely high synchrotron radiation and most of the power load will be shadowed at front end in order to shape final confining beam size for beam lines users. The high heat load components are known to be the critical parts to absorb the unwanted energy. In order to practically distribute high density power along each high heat load components, several absorbers are introduced. Namely, primary mask, main mask, photon absorber and slits. The manufacturing process such as UHV chemical cleaning, brazing and helium leaking test will be described in this report.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI098  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI099 Constructing and Installation of TPS Front End 4007
 
  • Y.T. Cheng, Y.T. Cheng, J. -Y. Chuang, C.K. Kuan, T.Y. Lee, H.Y. Lin, P.A. Lin, Y.K. Liu
    NSRRC, Hsinchu, Taiwan
 
  National Synchrotron Radiation Research Center (NSRRC) in Taiwan is completing the construction of Taiwan Photon Source (TPS) synchrotron accelerator project. This 3GeV, 500mA beam current 3rd generation synchrotron accelerator will have total of 7 insertion device beam lines at day one. Corresponding front ends have been design and fabricated. Installation and craning is underway. Current status of frond end are reported and presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI099  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI108 Manufacturing and Inspecting Supporting Tables for Front End in Taiwan Photon Source 4031
 
  • P.A. Lin, K.H. Hsu, C.K. Kuan, C.-S. Lin, H.Y. Lin, I.C. Sheng
    NSRRC, Hsinchu, Taiwan
 
  Taiwan Photon Source is the second accelerator constructed by National Synchrotron Radiation Research Center with energy 3 GeV and 500 mA beam current. In order to install and support front end components those table are designed and constructed. The results of manufacturing and inspecting tables are one of the primary factors that will directly affect the final confining aperture to the end usres. Those supporting table has six types and are all designed and simulated by Solidworks. Different alignment and measurement tools are utilized to inspect these tables. In addition, some results of final post-installation measurement and vibration test are also reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI108  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)