Author: Li, S.
Paper Title Page
TUPRO095 Using One-dimensional Hall Probe to Measure the Solenoid Magnet for CSNS/RCS 1262
 
  • Z. Zhang, S. Li, F. Long, X.J. Sun
    IHEP, Beijing, People's Republic of China
 
  Abstract CSNS(China Spallation Neutron Source) construction is expected to start in 2010 and will last 6.5 years. A long beam transport line is followed with the DTL linac to send the beam a rapid cycling synchrotron (RCS) accelerator. The beam will be focused by the solenoid magnet. This magnet will be located in LEBT system. It has been used with one-dimensional Hall probe to measurement by Institute of High Energy Physics, China. After the measurement, the measurement results meet the design requirements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO095  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPRO096 Field Measurement of the Quadrupole Magnet for CSNS/RCS 1265
 
  • L. Li, C.D. Deng, W. Kang, S. Li, D. Tang, H.J. Wang, B. Yin, Z. Zhang, J.X. Zhou
    IHEP, Beijing, People's Republic of China
 
  The quadrupole magnets are being manufactured and measured for China Spoliation Neutron Source Rapid Cycling Synchrotron (CSNS/RCS) since 2012. In order to evaluate the magnet qualities, a dedicated magnetic measurement system has been developed. The main quadrupole magnets have been excited with DC current biased 25Hz repetition rate. The measurement of magnetic field was mainly based on integral field and harmonics measurements at both static and dynamic conditions. This paper describes the magnet design, the field measurement system and presents the results of the quadrupole magnet.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO096  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)