Paper | Title | Page |
---|---|---|
TUOAA01 | Progress Towards Doubling the Beam Power at Fermilab's Accelerator Complex | 904 |
|
||
Funding: Work supported by the Fermi Research Alliance under contract to the U.S. Department of Energy. After a 16 month shutdown to reconfigure the Fermilab Accelerators for high power operations, the Fermilab Accelerator Complex is again providing beams for numerous Physics Experiments. By using the Recycler to slip stack protons while the Main Injector is ramping, the beam power at 120 GeV can reach 700 KW, a factor of 2 increase. The progress towards doubling the Fermilab's Accelerator complex beam power will be presented. |
||
![]() |
Slides TUOAA01 [7.059 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUOAA01 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |