TUPRO005 Status of the NICA Project at JINR 1003
 
  • G.V. Trubnikov, N.N. Agapov, A.V. Butenko, D.E. Donets, E.D. Donets, E.E. Donets, A.V. Eliseev, E.V. Gorbachev, A. Govorov, E.V. Ivanov, V. Karpinsky, V.D. Kekelidze, H.G. Khodzhibagiyan, S.A. Kostromin, A.D. Kovalenko, O.S. Kozlov, V.A. Matveev, I.N. Meshkov, V.A. Mikhailov, V. Monchinsky, N. Shurkhno, A.O. Sidorin, I. Slepnev, V. Slepnev, A.V. Smirnov, A. Sorin, N.D. Topilin, A. Tuzikov, V. Volkov
    JINR, Dubna, Moscow Region, Russia
  • O.I. Brovko, A.V. Philippov, N.V. Semin
    JINR/VBLHEP, Dubna, Moscow region, Russia
 
  Nuclotron-based Ion Collider fAcility (NICA) is the new accelerator complex being constructed in Joint Institute for Nuclear Research. General goal of the project is to provide experimental study of hot and dense strongly interacting QCD matter. The development of NICA injection complex is actively performed. Construction of new 3.2 MeV/u heavy-ion linear accelerator (HILac) is now under way in Germany. Construction of booster has been started. In this report the present status of the NICA accelerator complex are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRI089 Facility for Assembling and Serial Test of Superconducting Magnets 2700
 
  • S.A. Kostromin, N.N. Agapov, V.V. Borisov, A.R. Galimov, V. Karpinsky, H.G. Khodzhibagiyan, V.S. Korolev, D. Nikiforov, N.V. Semin, A.Y. Starikov, G.V. Trubnikov
    JINR, Dubna, Moscow Region, Russia
 
  The NICA/MPD project has been started at the Joint Institute for Nuclear Research (JINR) in Dubna in 2007. The NICA accelerator complex will consist of two injector chains, the new 600 MeV/u superconducting (SC) booster synchrotron, the existing SC synchrotron Nuclotron, and the new SC collider having two rings each of 503 m in circumference. The building construction of the new test facility for simultaneous cryogenic testing of the SC magnets on 6 benches is completed at the Laboratory of High Energy Physics. Premises with an area of 2600 m2 were prepared to install the equipment. The 15 kA, 25 V pulse power supply, the helium satellite refrigerator with capacity of 100 W were commissioned first bench for magnets testing is now under assembling. First magnets cryogenic tests are planned on July. Start of the serial production of the SC magnets for the booster synchrotron is planned for the end of 2014.  