Author: Gurov, S.M.
Paper Title Page
MOPRO088 The NSLS-II Booster Commissioning 295
 
  • S.M. Gurov, S.E. Karnaev, V.A. Kiselev, E.B. Levichev, S.V. Sinyatkin, A.N. Zhuravlev
    BINP SB RAS, Novosibirsk, Russia
  • V.V. Smaluk
    DLS, Oxfordshire, United Kingdom
 
  The National Synchrotron Light Source II is a third generation light source, which was constructed at Brookhaven National Laboratory. This project includes a highly-optimized 3 GeV electron storage ring, linac pre-injector, and full-energy synchrotron injector. Budker Institute of Nuclear Physics built and delivered the booster for NSLS-II. The commissioning of the booster was successfully completed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO088  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPME152 Application of the Optical Diagnostics during the Commissioning of the Booster of NSLS-II 3614
 
  • O.I. Meshkov, S.M. Gurov
    BINP SB RAS, Novosibirsk, Russia
  • V.V. Smaluk
    DLS, Oxfordshire, United Kingdom
  • X. Yang
    BNL, Upton, Long Island, New York, USA
 
  We describe the experience obtained with several types of diagnostics during commissioning of the booster of NSLS-II. The set includes fluorescent screens, synchrotron light monitors and beam loss monitors. The information that was useful for commissioning as well as advantages and disadvantages of each diagnostics are discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPME152  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)