Author: Guo, Y.H.
Paper Title Page
THPME027 Development of the injector II RFQ for China ADS project 3280
 
  • Z.L. Zhang, Y.H. Guo, Y. He, H. Jia, C.X. Li, Y. Liu, L. Lu, G. Pan, A. Shi, L.B. Shi, L.P. Sun, W.B. Wang, X.W. Wang, J.X. Wu, Q. Wu, X.B. Xu, B. Zhang, J.H. Zhang, H.W. Zhao, T.M. Zhu
    IMP, Lanzhou, People's Republic of China
  • M.D. Hoff, A.R. Lambert, D. Li, J.W. Staples, S.P. Virostek
    LBNL, Berkeley, California, USA
  • C. Zhang
    GSI, Darmstadt, Germany
 
  As one of the main components of the injector II of China ADS LINAC project, an RFQ working at 162.5MHz is used to accelerate proton beams of 15mA from 30 keV to 2.1 MeV. The four vane RFQ has been designed in collaboration with Lawrence Berkeley National Laboratory and built at the workshop of the Institute of Modern Physics, Chinese Academy of Sciences (IMP, CAS). Low power test of the cavity have been completed, and it shows the field flatness is within ±1% and the unloaded Q is 12600. RF conditioning has been completed, results of preliminary beam test show the output beam energy is 2.16 MeV with energy spread of 3.5% and the transmission efficiency is 97.9%. Continuous wave (CW) beam of 2.3 mA has been accelerated for more than one hour.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPME027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)