Author: Ferreira Somoza, J.A.
Paper Title Page
WEPME018 CERN Vacuum System Activities during the Long Shutdown 1: The LHC’s injector chain. 2291
 
  • J.A. Ferreira Somoza, P. Chiggiato
    CERN, Geneva, Switzerland
 
  During the long shutdown 1 (LS1), several maintenance, consolidation and upgrade activities have been carried out in LHC’s injector chain. Each machine has specific vacuum requirements and different history, which determine the present status of the vacuum components, their maintenance and consolidation needs. The present work presents the priorities agreed at the beginning of the LS1 period and their implementation. Of particular relevance are the interventions in radioactive controlled areas where several leaks due to stress corrosions stopped the operations in the past years. The strategy to reduce the collective dose is presented, in particular the use of remote controlled robots. An important part of the work performed during this period involves supporting other teams (acceptance tests, new equipment installation, etc.). Finally, as a result of the LS1 experience, a medium to long term strategy is depicted, focusing on the preparation of the next shutdown (LS2) and the integration of LINAC4 in the injector chain during the same period.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPME018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)