Author: Eddy, N.
Paper Title Page
WEPRI058 Commissioning Status of the Advanced Superconducting Test Accelerator at Fermilab 2615
 
  • J. Ruan, R. Andrews, C.M. Baffes, D.R. Broemmelsiek, K. Carlson, B. Chase, M.D. Church, D.J. Crawford, E. Cullerton, J.S. Diamond, N. Eddy, D.R. Edstrom, E.R. Harms, A. Hocker, A.S. Johnson, A.L. Klebaner, M.J. Kucera, J.R. Leibfritz, A.H. Lumpkin, J.N. Makara, S. Nagaitsev, O.A. Nezhevenko, D.J. Nicklaus, L.E. Nobrega, P.S. Prieto, J. Reid, J.K. Santucci, G. Stancari, D. Sun, M. Wendt, S.J. Wesseln
    Fermilab, Batavia, Illinois, USA
  • P. Piot
    Northern Illinois University, DeKalb, Illinois, USA
 
  Funding: *Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
The Advanced Superconducting Test Accelerator (ASTA) is under construction at Fermilab. This accelerator will consist of a photo-electron gun, injector, ILC-type cryomodules, and multiple downstream beam-lines. Its purpose is to be a user-based facility for Advanced Accelerator R&D. . Following the successful commissioning of the photoinjector gun, a Tesla style 8-cavity cryomodule and a high gradient capture cavity have been cooled down to 2 K and powered commissioning and performance characterization has begun. We will report on the commissioning status and near-term future plans for the facility.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRI058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)