Author: Chuang, J. -Y.
Paper Title Page
WEPME051 Development of the TPS Vacuum Interlock and Monitor Systems 2387
 
  • Y.C. Yang, B.Y. Chen, J.-R. Chen, Z.W. Chen, J. -Y. Chuang, G.-Y. Hsiung, T.Y. Lee
    NSRRC, Hsinchu, Taiwan
 
  The vacuum interlock and monitor systems of Taiwan Photon Source are designed to maintain the ultra-high vacuum condition and to protect the vacuum devices. The pressure readings of ionization gauges are taken as the judgment logic to control the opening and closing of sector gate valves so as to protect the ultra-high vacuum condition. Monitors of the water-cooling system and the chamber temperature serve to protect vacuum devices from radiation hazards. The preparation, installation and status of the interlock and monitor systems are presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPME051  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRI099 Constructing and Installation of TPS Front End 4007
 
  • Y.T. Cheng, Y.T. Cheng, J. -Y. Chuang, C.K. Kuan, T.Y. Lee, H.Y. Lin, P.A. Lin, Y.K. Liu
    NSRRC, Hsinchu, Taiwan
 
  National Synchrotron Radiation Research Center (NSRRC) in Taiwan is completing the construction of Taiwan Photon Source (TPS) synchrotron accelerator project. This 3GeV, 500mA beam current 3rd generation synchrotron accelerator will have total of 7 insertion device beam lines at day one. Corresponding front ends have been design and fabricated. Installation and craning is underway. Current status of frond end are reported and presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRI099  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)