Author: Choi, J.
Paper Title Page
TUPRI069 NSLS-II Commissioning with 500 MHZ 7-CELL PETRA-III Cavity 1724
 
  • A. Blednykh, G. Bassi, W.X. Cheng, J. Choi, Y. Hidaka, S.L. Kramer, Y. Li, B. Podobedov, J. Rose, T.V. Shaftan, G.M. Wang, F.J. Willeke, L.-H. Yu
    BNL, Upton, Long Island, New York, USA
 
  The NSLS-II storage ring has been commissioned during Phase 1 with 500 MHz 7-cell PETRA-III RF cavity. In this paper we present our first beam-measured data on instabilities and collective effects with a normal conducting RF system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRI069  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)