Author: Bouly, F.
Paper Title Page
TUPRO021 Preliminary Study of Risks and Failure Scenarios for the High Luminosity Experiments in HL-LHC 1055
 
  • F. Bouly
    LPSC, Grenoble Cedex, France
  • R. Alemany-Fernández, H. Burkhardt, D. Wollmann
    CERN, Geneva, Switzerland
  • B. Yee-Rendón
    CINVESTAV, Mexico City, Mexico
 
  For the HL-LHC it is planned to basically double the diameter of the triplet quadruple magnets around the high luminosity insertions of the LHC. The high luminosity experiments ATLAS and CMS would like to keep a small central chamber radius close the interaction point. In the context of collider-experiment studies for the high-luminosity upgrade of the LHC, we present a first study of the possible consequences of these changes for the experimental running conditions based on detailed simulations with tracking. We have started to implement crab cavity failures and discuss first results from these simulations.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRO021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRO099 Toward a Virtual Accelerator Control System for the MYRRHA Linac 3122
 
  • J.-P. Carneiro
    Fermilab, Batavia, Illinois, USA
  • J.-L. Biarrotte
    IPN, Orsay, France
  • F. Bouly
    LPSC, Grenoble Cedex, France
  • L. Medeiros Romão, R. Salemme, D. Vandeplassche
    SCK•CEN, Mol, Belgium
  • D. Uriot
    CEA/DSM/IRFU, France
 
  The MYRRHA project currently under development at Mol, Belgium, is an Accelerator Driven System expected to be operational in 2023 with the primary purpose to study the feasibility of efficiently transmuting nuclear waste products into isotopes with much shorter lifetimes. The reactor, which is expected to have a thermal power of ~70 MW, may be operated in subcritical mode when fed by spallation neutrons obtained from a 600 MeV superconducting proton linac hitting a Liquid Pb-Bi eutectic (LBE) target with an average current of 4 mA. The challenging aspect of the MYRRHA linac resides in its very high availability (close to 100%) with a Mean Time Between Failure expected to be higher than 250 hours. This paper presents the strategic approach taken during the design of the linac and its foreseen operation to fulfill this stringent requirement. In particular we will describe the concept of a beam dynamics based control system also called Virtual Accelerator which will be mandatory for the operation of such linac.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPRO099  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)