Author: Borisov, V.V.
Paper Title Page
WEPRI088 Magnetic Measurement System for the NICA Booster Magnets 2696
 
  • V.V. Borisov, A. Donyagin, O. Golubitsky, A. Golunov, N. Gorbunov, H.G. Khodzhibagiyan, N.A. Morozov, S. Rubtsun
    JINR, Dubna, Moscow Region, Russia
 
  NICA is a new accelerator collider complex presently under construction at Joint Institute for Nuclear Research (JINR) in Dubna. More than 250 superconducting magnets need for the NICA booster and collider. These magnets will be assembled and tested at the new test facility in the Laboratory of High Energy Physics JINR. The first phase of the system for magnetic measurements was commissioned in late 2013. A method of measuring the quality of the magnetic field in the aperture of the curved dipole magnet for the booster synchrotron is described. First results of magnetic measurements are presented and discussed. Commissioning of equipment for magnetic measurements in the aperture of quadrupole magnets for the NICA booster is close to completion.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRI088  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRI089 Facility for Assembling and Serial Test of Superconducting Magnets 2700
 
  • S.A. Kostromin, N.N. Agapov, V.V. Borisov, A.R. Galimov, V. Karpinsky, H.G. Khodzhibagiyan, V.S. Korolev, D. Nikiforov, N.V. Semin, A.Y. Starikov, G.V. Trubnikov
    JINR, Dubna, Moscow Region, Russia
 
  The NICA/MPD project has been started at the Joint Institute for Nuclear Research (JINR) in Dubna in 2007. The NICA accelerator complex will consist of two injector chains, the new 600 MeV/u superconducting (SC) booster synchrotron, the existing SC synchrotron Nuclotron, and the new SC collider having two rings each of 503 m in circumference. The building construction of the new test facility for simultaneous cryogenic testing of the SC magnets on 6 benches is completed at the Laboratory of High Energy Physics. Premises with an area of 2600 m2 were prepared to install the equipment. The 15 kA, 25 V pulse power supply, the helium satellite refrigerator with capacity of 100 W were commissioned first bench for magnets testing is now under assembling. First magnets cryogenic tests are planned on July. Start of the serial production of the SC magnets for the booster synchrotron is planned for the end of 2014.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPRI089  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)