Author: Bochek, D.V.
Paper Title Page
MOPRO018 Booster of Electrons and Positrons (BEP) Upgrade to 1 GeV 102
 
  • D.B. Shwartz, D.E. Berkaev, D.V. Bochek, I. Koop, I.E. Korenev, A.A. Krasnov, I.K. Sedlyarov, P.Yu. Shatunov, Y.M. Shatunov, I.M. Zemlyansky
    BINP SB RAS, Novosibirsk, Russia
 
  At present new electron and positron injection complex in BINP is comissioned and ready to feed VEPP-2000 collider with intensive beams with energy of 450 MeV. To obtain peak luminosity limited only by beam-beam effects in whole energy range of 160-1000 MeV and to perform high average luminosity with small dead time the top-up injection is needed. Booster BEP upgrade to 1 GeV includes modification of all magnetic elements, including warm dipoles magnetic field increase up to 2.6 T, vacuum chamber, RF-system, injection-extraction system. BEP comissioning is scheduled to the end of 2014.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO018  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)