JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for THPME048: Status and Plans for Linac4 Installation and Commissioning

TY - CONF
AU - Vretenar, M.
AU - Akroh, A.
AU - Arnaudon, L.
AU - Baudrenghien, P.
AU - Bellodi, G.
AU - Broere, J.C.
AU - Brunner, O.
AU - Comblin, J.F.
AU - Coupard, J.
AU - Dimov, V.A.
AU - Fuchs, J.-F.
AU - Funken, A.
AU - Gerigk, F.
AU - Granemann Souza, E.
AU - Hanke, K.
AU - Hansen, J.
AU - Kozsar, I.
AU - Lallement, J.-B.
AU - Lenardon, L.
AU - Lettry, J.
AU - Lombardi, A.M.
AU - Maglioni, C.
AU - Midttun, Ø.
AU - Mikulec, B.
AU - Nisbet, D.
AU - Paoluzzi, M.M.
AU - Raich, U.
AU - Ramberger, S.
AU - Roncarolo, F.
AU - Rossi, C.
AU - Sanchez Alvarez, J.L.
AU - Scrivens, R.
AU - Tan, J.
AU - Valerio, C.A.
AU - Vollaire, J.
AU - Wegner, R.
AU - Weisz, S.
AU - Yarmohammadi Satri, M.
AU - Zocca, F.
ED - Petit-Jean-Genaz, Christine
ED - Arduini, Gianluigi
ED - Michel, Peter
ED - Schaa, Volker RW
TI - Status and Plans for Linac4 Installation and Commissioning
J2 - Proc. of IPAC2014, Dresden, Germany, June 15-20, 2014
C1 - Dresden, Germany
T2 - International Particle Accelerator Conference
T3 - 5
LA - english
AB - Linac4 is a normal conducting 160 MeV H⁻ linear accelerator presently being installed and progressively commissioned at CERN. It will replace the ageing 50 MeV Linac2 as injector of the PS Booster (PSB), increasing at the same time its brightness by a factor of two thanks to the higher injection energy. This will be the first step of a program to increase the beam intensity in the LHC injectors for the needs of the High-Luminosity LHC project. After a series of beam measurements on a dedicated test stand the 3 MeV Linac4 front-end, including ion source, RFQ and a beam chopping line, has been recommissioned at its final position in the Linac4 tunnel. Commissioning of the following section, the Drift Tube Linac, is starting. Beam commissioning will take place in steps of increasing energy, to reach the final 160 MeV in 2015. An extended beam measurement phase including testing of stripping equipment for the PSB and a year-long test run to assess and improve Linac4 reliability will take place in 2016, prior to the connection of Linac4 to the PSB that will take place during the next long LHC shut-down.
PB - JACoW
CP - Geneva, Switzerland
SP - 3332
EP - 3334
KW - linac
KW - ion
KW - rfq
KW - ion-source
KW - emittance
DA - 2014/07
PY - 2014
SN - 978-3-95450-132-8
DO - 10.18429/JACoW-IPAC2014-THPME048
UR - http://jacow.org/ipac2014/papers/thpme048.pdf
ER -