Author: Yu, J.B.
Paper Title Page
THPFI024 Application of Electropolishing in CSNS/RCS Primary Collimator Scrapers 3348
 
  • L. Kang, Z.X. He, H. Qu, J.B. Yu, Y.Q. Zou
    IHEP, Beijing, People's Republic of China
 
  According to the requirements for the beam collimation system physical design of the rapid cycling synchrotron (RCS) of China Spallation Neutron Source (CSNS) , the primary collimator scrapers are made of 0.17±0.005mm thickness tungsten sheets. The machining of the tungsten sheet is very difficult because of high hardness and characteristics of the intrinsic brittleness of tungsten. In this paper, electropolishing processing methods is used for tungsten sheets processing. A special electropolishing device is designed according to the principle and process of electropolishing. The processing of tungsten sheets are finally completed after a series of experiments. And the rules of electropolishing for tungsten sheet processing are obtained according to the experimental results.  
 
THPFI031 Development of Beam Collimators for the 1.6 GeV Rapid Cycling Synchrotron of CSNS 3364
 
  • J.B. Yu, pf.He. He, L. Kang, H. Qu, Y.Q. Zou
    IHEP, Beijing, People's Republic of China
 
  In order to reduce the uncontrolled losses in the localized station, the beam collimation system has been performed for the 1.6GeV synchrotron of CSNS. The CSNS/RCS transverse collimation system is designed to be a two-stage system which consists of one primary collimator and four secondary collimators. Much work about machinery design and manufacture of the collimation system has been done till now. This paper will show the exterior frame of collimation system by considering the physical demands and spatial position. Then the progress which contains design and machining of collimators will also be introduced. Finally some problems which are mainly about the design of secondary collimators will be mentioned.