Author: Wehrle, U.
Paper Title Page
WEPEA061 The First LHC p-Pb run: Performance of the Heavy Ion Production Complex 2648
 
  • D. Manglunki, M. E. Angoletta, H. Bartosik, G. Bellodi, A. Blas, M.A. Bodendorfer, T. Bohl, C. Carli, E. Carlier, S. Cettour Cave, K. Cornelis, H. Damerau, A. Findlay, S.S. Gilardoni, S. Hancock, J.M. Jowett, D. Kuchler, M. O'Neil, Y. Papaphilippou, S. Pasinelli, R. Scrivens, G. Tranquille, B. Vandorpe, U. Wehrle, J. Wenninger
    CERN, Geneva, Switzerland
 
  TThe first LHC proton-ion run took place in January-February 2013; it was the first extension to the collider programme, as this mode was not included in the design report. This paper presents the performance of the heavy ion and proton production complex, and details the issues encountered, in particular the creation of the same bunch pattern in both beams.  
 
WEPME060 First Results and Analysis of the Performance of a 4 GS/s Intra-bunch Vertical Feedback System at the SPS 3070
 
  • J.M. Cesaratto, J.E. Dusatko, J.D. Fox, J.J. Olsen, K.M. Pollock, C.H. Rivetta, O. Turgut
    SLAC, Menlo Park, California, USA
  • H. Bartosik, W. Höfle, G. Kotzian, U. Wehrle
    CERN, Geneva, Switzerland
 
  Funding: Work supported by the U.S. Department of Energy under contract DE-AC02-76SF00515 and the US LHC Accelerator Research program ( LARP)
We present experimental measurements taken from SPS machine development studies with an intra-bunch feedback channel. These studies use a digital signal processing system to implement general-purpose control algorithms on multiple samples across a single SPS bunch ( for ease of synchronization with the SPS RF frequency a sampling frequency of 3.2 GS/sec. is implemented). These initial studies concentrate on single-bunch motion, and study the vertical betatron motion as the feedback control is varied. The studies are focused on validating simulation models of the beam dynamics with feedback. Time and frequency domain results include excitation and damping of intra-bunch motion with positive and negative feedback. We present an overview of the challenges of intra-bunch feedback, and highlight methods to time-align the pickup and kicker signals within the closed-loop feedback channel.