MOPEA058 CNGS, CERN Neutrinos to Gran Sasso, Five Years of Running a 500 Kilowatt Neutrino Beam Facility at CERN 211
 
  • E. Gschwendtner, K. Cornelis, I. Efthymiopoulos, A. Pardons, H. Vincke, J. Wenninger
    CERN, Geneva, Switzerland
  • I. Krätschmer
    HEPHY, Wien, Austria
 
  The CNGS facility (CERN Neutrinos to Gran Sasso) aims at directly detecting muon to tau neutrino oscillations where an intense muon-neutrino beam (1017 muon-neutrinos/day) is generated at CERN and directed over 732km towards the Gran Sasso National Laboratory, LNGS, in Italy, where two large and complex detectors, OPERA and ICARUS, are located. The CNGS facility (CNGS Neutrinos to Gran Sasso) started with the physics program in 2008 and delivered until the end of the physics run 2012 more than 80% of the approved protons on target (22.5·1019 pot). An overview of the performance and experience gained in operating this 500kW neutrino beam facility is described. Major events since the commissioning of the facility in 2006 are summarized. Highlights on the CNGS beam performance are given.  
 
TUPEA052 Design Study for a CERN Short Base-Line Neutrino Facility 1250
 
  • R. Steerenberg, M. Calviani, I. Efthymiopoulos, A. Ferrari, B. Goddard, R. Losito, M. Nessi, J.A. Osborne, L. Scibile, H. Vincke
    CERN, Geneva, Switzerland
  • P.R. Sala
    Istituto Nazionale di Fisica Nucleare, Milano, Italy
 
  A design study has been initiated at CERN for the conception and construction of a short base line neutrino facility, using a proton beam from the CERN Super Proton Synchrotron (SPS) that will be transferred to a new secondary beam production facility, which will provide a neutrino beam for experiments and detector R&D. This paper resumes the general layout of the facility together with the main primary and secondary beam parameters and the choices favoured for the neutrino beam production.  
 
THPFI056 Design Study for a Future LAGUNA-LBNO Long-baseline Neutrino Facility at CERN 3418
 
  • I. Efthymiopoulos, J. Alabau-Gonzalvo, A. Alekou, F. Antoniou, M. Benedikt, M. Calviani, A. Ferrari, R. Garoby, F. Gerigk, S.S. Gilardoni, B. Goddard, A. Kosmicki, C. Lazaridis, J.A. Osborne, Y. Papaphilippou, A.S. Parfenova, E.N. Shaposhnikova, R. Steerenberg, P. Velten, H. Vincke
    CERN, Geneva, Switzerland
 
  A design study for a long baseline neutrino oscillation experiment (LBNO) with a new conventional neutrino beamline facility (CN2PY) at CERN was initiated in September 2011, supported by EU/FP7 funds. The beam will be aimed at a next generation deep-underground neutrino observatory located at the Pyhasalmi (Finland) mine at a distance of 2300 km. In an initial phase the CN2PY facility will use a 400 GeV beam extracted from SPS up to a maximum power of 750 kW, and in a second phase a 2 MW beam of about 50 GeV produced by a new High-Power Proton Synchrotron accelerator using the LP-SPL as injector also under design. The paper will focus on the design challenges of this MW-class facility and on the optimization studies of the secondary beam elements (target and horns) to produce a neutrino beam spectrum that matches best the experimental requirements for neutrino flavor oscillations and CP-violation tests. The challenges and bottlenecks in the existing CERN accelerator complex to produce the high-intensity beams foreseen for this facility at the initial phase are discussed.