WEPME020 Alignment Plan and Survey Results of the Equipment for J-PARC 3 GeV RCS 2971
 
  • N. Tani, H. Hotchi, J. Kamiya, M. Kinsho, O. Takeda, M. Yamamoto
    JAEA/J-PARC, Tokai-mura, Japan
 
  Misalignment of several millimeters of the magnets of J-PARC 3GeV RCS in both horizontal and vertical directions was caused by the Tohoku Region Pacific Coast Earthquake on March 11, 2011. As the result of orbit calculation showed that the beam loss was acceptable for beam operation at 300kW, beam operation with the current placement has been implemented. Realignment of the equipment will be carried out from August to December in 2013. Survey carried out in the summer of 2013 found out misalignment of ceramic vacuum ducts therefore their positioning is necessary. In this paper, these measurement result and latest alignment plan for J-PARC 3GeV RCS are reported.