Paper | Title | Page |
---|---|---|
MOPEA053 | Status of NSLS-II Booster | 196 |
|
||
The National Synchrotron Light Source II is a third generation light source under construction at Brookhaven National Laboratory. The project includes a highly optimized 3 GeV electron storage ring, linac pre-injector and full-energy injector-synchrotron. Budker Institute of Nuclear Physics build booster for NSLS-II. The booster should accelerate the electron beam continuously and reliably from a minimum 170 MeV injection energy to a maximum energy of 3.15 GeV and average beam current of 20 mA. The booster shall be capable of multi-bunch and single bunch operation. Pre-comissioning test results of booster components and system are reviewed. | ||
MOPEA080 | Status of the NSLS-II Injector | 273 |
|
||
We discuss the current status and plans for developing the NSLS-II injector. The latter consists of a 200 MeV linac, a 3-GeV booster, transport lines and the storage ring injection straight section. The system design and installation are complete. Last year we concluded 200-MeV linac commissioning and are planning to commission the 3 GeV booster during summer of 2013. | ||
WEPWA083 | Results of NSLS-II Linac Commissioning | 2301 |
|
||
Funding: This manuscript has been authored by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The NSLS-II linac is a 200 MeV normal conducting linac procured as a turn key system from Research Instruments. The linac and associated transport lines were installed at BNL in the winter of 2012. Commissioning activities started March 26 and lasted for 2.5 months. In this report we discuss the successful commissioning results of the linac, issues encountered, and the remaining work that needs to be accomplished for NSLS-II booster commissioning. |
||