MOPEA080 | Status of the NSLS-II Injector | 273 |
|
||
We discuss the current status and plans for developing the NSLS-II injector. The latter consists of a 200 MeV linac, a 3-GeV booster, transport lines and the storage ring injection straight section. The system design and installation are complete. Last year we concluded 200-MeV linac commissioning and are planning to commission the 3 GeV booster during summer of 2013. | ||
THPME052 | Analysis of the NSLS-II Magnet Measurement Data | 3624 |
|
||
Funding: Work supported by U.S. DOE, Contract No. DE-AC02-98CH10886 NSLS-II is a third generation 3GeV light source that is under-construction at the Brookhaven National Laboratory. The 30-DBA-cell storage ring will provide micron size beam resulting from the 1nm emittance. Recently the last magnet was received and the completion of girder installation in the tunnel is foreseeable in a few months. In this paper we will briefly review the physics considerations for the magnet specifications, the major field quality related issues that arose during the fabrication process. Our emphasis will be on the statistical analysis of the magnet measurement results and comparison with the design tolerances. |
||