Paper | Title | Page |
---|---|---|
MOPME031 | Emittance Measurement with Multi-wire Scanners for BEPC-II Linac | 541 |
|
||
During the BEPC-II linac upgrade, five wire scanners have been installed in the common transport line, which makes a fast emittance measurement possible. In this paper, we will show the primary results of BEPC-II linac emittance measurement using multi-wire scanner method. The least squares method will be used for data analysis. A comparison of the results with the ones obtained by quad scan method will also be given. | ||
TUPME021 | Optimization Parameter Design of a Circular e+e− Higgs Factory | 1616 |
|
||
Funding: NSFC:11175192 In this paper we will show a genral method of how to make an optimized parameter design of a circular e+e− Higgs Factory by using analytical expression of maximum beam-beam parameter and beamstrahlung beam lifetime started from given design goal and technical limitations. A parameter space has been explored. |
||