Paper | Title | Page |
---|---|---|
THPWO074 | Technical Design of the ESS Facility | 3927 |
|
||
The 5 MW European Spallation Source is entering a construction phase for the entire facility. This paper surveys the unique features, challenges and open issues that exist, from ion source to target, and from moderator to instruments. It is consistent with the ESS-wide Technical Design Report, published in April 2013.
The paper is presented on behalf of the ESS consortium, and all the contributors to the ESS TDR. |
||