TUOAB101 Installation and Commissioning of the 1.1 MW Deuteron Prototype Linac for IFMIF 1090
 
  • J. Knaster
    IFMIF/EVEDA, Rokkasho, Japan
  • P. Cara, A. Mosnier
    Fusion for Energy, Garching, Germany
  • S. Chel
    CEA/DSM/IRFU, France
  • J. Molla
    CIEMAT, Madrid, Spain
  • H. Suzuki
    Japan Atomic Energy Agency (JAEA), International Fusion Energy Research Center (IFERC), Rokkasho, Kamikita, Aomori, Japan
 
  IFMIF, the International Fusion Materials Irradiation Facility, will learn the degradation of the mechanical properties of purpose designed reduced activation ferritic-martensitic steels under bombardment of 14 MeV neutrons at 1018 n/m2s flux reaching values of 150 displacements per atom in the steel lattice. The understanding of the impact of Deuterium-Tritium fusion neutrons in next decade is essential to design and construct a fusion power plant; the next step after ITER. The 14 MeV neutrons are stripped from a liquid Li screen flowing at 15 m/s impacted by 2 parallel 125 mA deuteron beam at 40 MeV. IFMIF project, in its engineering validation phase, will operate in Rokkasho a 125 mA deuteron LINAC at 9 MeV that will validate the concept of IFMIF accelerator, LIPAc. The ion source will inject 140 mA deuterons at 100 KeV in a normal-conducting RFQ that will deliver the bunched beam at 5MeV to be accelerated up to 9 MeV thanks to 8 half-wave superconducting resonators. The installation and commissioning of LIPAc in Rokkasho (Japan) is sequential and the first stage is starting now; the strategy to overcome potential difficulties is detailed.  
slides icon Slides TUOAB101 [2.396 MB]  
 
WEPWO043 IFMIF-EVEDA SRF Linac Couplers Test Bench 2396
 
  • D. Regidor, I. Kirpitchev, J. Molla, P. Méndez, A. Salom, M. Weber
    CIEMAT, Madrid, Spain
  • M. Desmons, N. Grouas, P. Hardy, V.M. Hennion, H. Jenhani, F. Orsini
    CEA/IRFU, Gif-sur-Yvette, France
 
  The IFMIF-EVEDA SRF Linac is a cryomodule equipped with eight superconducting HWR cavities, operating at the frequency of 175 MHz and powered by 200kW CW RF couplers. Before assembling the couplers to the cryomodule, it is necessary to process them using high levels of RF power. In order to perform this conditioning, the power couplers must be connected to a RF network which is fed by an RF source and ended with a load or a short-circuit, depending on the conditioning mode to be applied. A test bench has been designed for the conditioning of the SRF LINAC couplers. The main component is the “test box”, a resonant cavity where two couplers will be assembled to transmit the 200 kW from the RF source to the appropriate termination. The test box includes a large pumping port allowing an efficient pumping of the entire vacuum volume limited by the coupler ceramic windows. Several diagnostics as light detectors, vacuum gauges and thermal transducers will provide information on the relevant parameters for the control of the RF conditioning process. In addition, a support frame has been designed to maintain the whole assembly and reduce the mechanical stress on the couplers.