Author: Ludwig, M.
Paper Title Page
MOPWA037 Commissioning of the CERN Linac4 BPM System with 50 MeV Proton Beams 750
 
  • J. Tan, M. Ludwig, L. Søby, M. Sordet, M. Wendt
    CERN, Geneva, Switzerland
 
  The new Linac4 at CERN will provide a 160 MeV H ion beam for charge-exchange injection into the existing CERN accelerator complex. Shorted stripline pick-ups placed in the Linac intertank regions and the transfer lines will measure beam orbit, relative beam current, beam phase, and average beam energy via the time-of-flight between two beam pickups. A prototype Beam Position Monitor (BPM) system has been installed in the transfer line between the existing Linac2 and the Proton Synchrotron Booster (PSB) in order to study and review the complete acquisition chain. This paper presents measurements and performance of this BPM system operating with 50 MeV proton beams, and compares the results with laboratory measurements and electromagnetic simulations.  
 
WEPEA046 Experimental Observations from the LHC Dynamic Aperture Machine Development Study in 2012 2606
 
  • M. Giovannozzi, S. Cettour Cave, R. De Maria, M. Ludwig, A. Macpherson, S. Redaelli, F. Roncarolo, M. Solfaroli Camillocci, W. Venturini Delsolaro
    CERN, Geneva, Switzerland
 
  In view of improving the understanding of the behaviour of the dynamic aperture and to benchmark the numerical simulations performed so far, two experimental sessions have been scheduled at the LHC. The observations of the first sessions have been reported elsewhere[1], while in this paper the latest observations in terms of beam currents, blm losses and beam sizes will be described. The octupolar spool pieces have been used to artificially reduce the dynamic aperture and then induced slow beam losses. Alternating signs have been used in order to probe different configurations. Finally, scans over the strength of the decapolar spool pieces have been performed too.
[1] M. Giovannozzi et al., “First Experimental Observations from the LHC Dynamic Aperture Experiment”, in proceedings of IPAC12, p. 1362
 
 
WEPEA063 Upgrades and Consolidation of the CERN AD for Operation during the Next Decades 2654
 
  • T. Eriksson, M. E. Angoletta, L. Arnaudon, J.A. Baillie, M. Calviani, F. Caspers, L.V. Joergensen, R. Kersevan, G. Le Godec, R. Louwerse, M. Ludwig, S. Maury, A. Newborough, C. Oliveira, G. Tranquille
    CERN, Geneva, Switzerland
 
  As the ELENA project is now well underway, focus is turned to the Antiproton Decelerator (AD) itself. Most of the machine’s key components are in operation since more than 25 years and a substantial consolidation program is now being launched in view of continued operation beyond 2025. Over the course of the next few years a progressive consolidation of the AD-Target area, the AD-ring and all associated systems will take place. Several investigations have recently been performed in the target area with the objective of establishing the radiation environment and the sensitivity of the antiproton production to potential misalignment of the production elements. Identification of reliability and serviceability issues of the AD-ring components and associated systems has been done and will continue during the 2013 shut-down. Planned and ongoing consolidation activities are also discussed with emphasis on stochastic and electron beam cooling, instrumentation, RF systems, vacuum, magnets, power converters and beam transfer equipment.