Author: Li, P.Z.
Paper Title Page
WEPFI026 Design and Commissioning of the RF System of CYCIAE 14 Cyclotron 2759
 
  • Z.G. Yin, B. Ji, Y. Lei, P.Z. Li, G.F. Song, C. Wang, T.J. Zhang, Z.L. Zhao
    CIAE, Beijing, People's Republic of China
 
  The RF system of CYCIAE-14 consists of a set of 20kW amplifier, two 1/4λ RF cavities connected in central region, the transmission line and a set of LLRF system. The LLRF system, based on DDS and DSP, has achieved the close-loop adjustment of accelerating voltage and the resonant frequency. The RF system design for CYCIAE-14 was started in 2010, and the fabrication of the major equipments was finished in 2011. The installation and commissioning was completed in early 2012, satisfying the design requirements. This article describes the design of the RF system, and summarizes the difficulties encountered in the process of manufacture, installation and commissioning. Some of the problems caused by the transmission line and the RF leakage are analyzed, followed by the measures taken to solve these problems.  
 
THPFI018 The Design and Construction of Stripping Probe System for CYCIAE-100 3333
 
  • Shizhong. An, F.P. Guan, P.Z. Li, L.P. Wen, H.D. Xie, Z.G. Yin, T.J. Zhang
    CIAE, Beijing, People's Republic of China
 
  A 100 MeV H compact cyclotron is being constructed in China Institute of Atomic Energy (CYCIAE-100). 75 MeV - 100 MeV proton beams with 200 μA beam intensity will be extracted in dual opposite directions by charge exchange stripping devices. Two stripping probes with carbon foils are inserted radially in the opposite direction from the main magnet pole and the obtained two proton beams after stripping foil are transported into the crossing point in a combination magnet center separately under the fixed main magnetic field. Because of the large energy range of the extracted beam, the stripping probe system is the most critical and complicated device in the dual extraction. In order to save the foil changing time, the structure of the foil changing system in the vacuum is adopted. The foil automatic changing machine is outside the magnetism yoke and 12 pieces foil can be changed in one time. The design and fabrication of the probe system has been finished and it is going to the progress of installation and adjusting. The experimental verification on probe rod driving and foil changing system has been finished in 2010. The whole stripping extraction system will be installed in 2013.