|
- G.M. Wang, B. Bacha, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, W. Guo, K. Ha, H.-C. Hseuh, Y. Hu, W. Louie, M.A. Maggipinto, D. Padrazo, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, K. Vetter, F.J. Willeke, H. Xu, L. Yang, X. Yang
BNL, Upton, Long Island, New York, USA
- P.B. Cheblakov, A.A. Derbenev, A.I. Erokhin, S.M. Gurov, R.A. Kadyrov, S.E. Karnaev, E.A. Simonov, S.V. Sinyatkin, V. Smalyuk
BINP SB RAS, Novosibirsk, Russia
|
|
|
The NSLS-II is a state of the art 3 GeV synchrotron light source under construction at Brookhaven National Laboratory. Since 2012, the injector system gradually moves to the commissioning stage. It occurs after group people efforts on optics design, equipment specifications, construction and tests, assembly, installation and alignment. It is very important and exciting. To make the commissioning smooth and efficient, an important effort was put on the sub-system integration test to make sure the device function along with utility, timing system and control system, to calibrate diagnostics system and to debug high level application with simulated beam signals and required hardware. In this paper, we report our integration test experience and related control system software development.
|
|