MOPEA053 |
Status of NSLS-II Booster |
196 |
|
- S.M. Gurov, A.I. Erokhin, S.E. Karnaev, V.A. Kiselev, E.B. Levichev, A. Polyansky, A.M. Semenov, S.V. Shiyankov, S.V. Sinyatkin, V.V. Smaluk
BINP SB RAS, Novosibirsk, Russia
- H.-C. Hseuh, T.V. Shaftan
BNL, Upton, Long Island, New York, USA
|
|
|
The National Synchrotron Light Source II is a third generation light source under construction at Brookhaven National Laboratory. The project includes a highly optimized 3 GeV electron storage ring, linac pre-injector and full-energy injector-synchrotron. Budker Institute of Nuclear Physics build booster for NSLS-II. The booster should accelerate the electron beam continuously and reliably from a minimum 170 MeV injection energy to a maximum energy of 3.15 GeV and average beam current of 20 mA. The booster shall be capable of multi-bunch and single bunch operation. Pre-comissioning test results of booster components and system are reviewed.
|
|
|
MOPEA080 |
Status of the NSLS-II Injector |
273 |
|
- T.V. Shaftan, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, G. Ganetis, F. Gao, A. Goel, W. Guo, K. Ha, R. Heese, H.-C. Hseuh, M.P. Johanson, B.N. Kosciuk, S. Kowalski, S.L. Kramer, Y. Li, W. Louie, S. Ozaki, D. Padrazo, J. Rose, S. Seletskiy, S.K. Sharma, G. Shen, O. Singh, V.V. Smaluk, Y. Tian, K. Vetter, W.H. Wahl, G.M. Wang, F.J. Willeke, X. Yang, L.-H. Yu, P. Zuhoski
BNL, Upton, Long Island, New York, USA
|
|
|
We discuss the current status and plans for developing the NSLS-II injector. The latter consists of a 200 MeV linac, a 3-GeV booster, transport lines and the storage ring injection straight section. The system design and installation are complete. Last year we concluded 200-MeV linac commissioning and are planning to commission the 3 GeV booster during summer of 2013.
|
|
|
THPEA063 |
NSLS II Injector Integrated Testing |
3285 |
|
- G.M. Wang, B. Bacha, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, W. Guo, K. Ha, H.-C. Hseuh, Y. Hu, W. Louie, M.A. Maggipinto, D. Padrazo, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, K. Vetter, F.J. Willeke, H. Xu, L. Yang, X. Yang
BNL, Upton, Long Island, New York, USA
- P.B. Cheblakov, A.A. Derbenev, A.I. Erokhin, S.M. Gurov, R.A. Kadyrov, S.E. Karnaev, E.A. Simonov, S.V. Sinyatkin, V. Smalyuk
BINP SB RAS, Novosibirsk, Russia
|
|
|
The NSLS-II is a state of the art 3 GeV synchrotron light source under construction at Brookhaven National Laboratory. Since 2012, the injector system gradually moves to the commissioning stage. It occurs after group people efforts on optics design, equipment specifications, construction and tests, assembly, installation and alignment. It is very important and exciting. To make the commissioning smooth and efficient, an important effort was put on the sub-system integration test to make sure the device function along with utility, timing system and control system, to calibrate diagnostics system and to debug high level application with simulated beam signals and required hardware. In this paper, we report our integration test experience and related control system software development.
|
|
|