Paper | Title | Page |
---|---|---|
MOPEA080 | Status of the NSLS-II Injector | 273 |
|
||
We discuss the current status and plans for developing the NSLS-II injector. The latter consists of a 200 MeV linac, a 3-GeV booster, transport lines and the storage ring injection straight section. The system design and installation are complete. Last year we concluded 200-MeV linac commissioning and are planning to commission the 3 GeV booster during summer of 2013. | ||