Author: Gurov, S.M.
Paper Title Page
MOPEA053 Status of NSLS-II Booster 196
 
  • S.M. Gurov, A.I. Erokhin, S.E. Karnaev, V.A. Kiselev, E.B. Levichev, A. Polyansky, A.M. Semenov, S.V. Shiyankov, S.V. Sinyatkin, V.V. Smaluk
    BINP SB RAS, Novosibirsk, Russia
  • H.-C. Hseuh, T.V. Shaftan
    BNL, Upton, Long Island, New York, USA
 
  The National Synchrotron Light Source II is a third generation light source under construction at Brookhaven National Laboratory. The project includes a highly optimized 3 GeV electron storage ring, linac pre-injector and full-energy injector-synchrotron. Budker Institute of Nuclear Physics build booster for NSLS-II. The booster should accelerate the electron beam continuously and reliably from a minimum 170 MeV injection energy to a maximum energy of 3.15 GeV and average beam current of 20 mA. The booster shall be capable of multi-bunch and single bunch operation. Pre-comissioning test results of booster components and system are reviewed.  
 
MOPWA025 2Hz Ramping Mode Dipole Power Supply for Testing the NSLSII Booster Dipole Magnets 714
 
  • A.I. Erokhin, A.V. Bulatov, K. Gorchakov, S.M. Gurov, V.V. Kolmogorov, A.A. Kremnev, D.N. Pureskin, D.V. Senkov, R.V. Vakhrushev
    BINP SB RAS, Novosibirsk, Russia
 
  Budker Institute has designed and delivered Booster for NSLSII project including vacuum system, magnet system, diagnostics and power supplies. Dipole power supplies were directly delivered to BNL by sub-contractor (Danfysik, Denmark). To test dipole magnets on factory side, at BINP, it was decided to design and construct a high current ramping mode power supply. The designed power supply can operate with the reactive output power up to 150kVA and output current up to 900A at 2Hz ramping mode. The absolute accuracy achieved is better than 100ppm for the injection and extraction flats and better than 500ppm for the ramps.  
 
THPEA063 NSLS II Injector Integrated Testing 3285
 
  • G.M. Wang, B. Bacha, A. Blednykh, E.B. Blum, W.X. Cheng, J. Choi, L.R. Dalesio, M.A. Davidsaver, J.H. De Long, R.P. Fliller, W. Guo, K. Ha, H.-C. Hseuh, Y. Hu, W. Louie, M.A. Maggipinto, D. Padrazo, T.V. Shaftan, G. Shen, O. Singh, Y. Tian, K. Vetter, F.J. Willeke, H. Xu, L. Yang, X. Yang
    BNL, Upton, Long Island, New York, USA
  • P.B. Cheblakov, A.A. Derbenev, A.I. Erokhin, S.M. Gurov, R.A. Kadyrov, S.E. Karnaev, E.A. Simonov, S.V. Sinyatkin, V. Smalyuk
    BINP SB RAS, Novosibirsk, Russia
 
  The NSLS-II is a state of the art 3 GeV synchrotron light source under construction at Brookhaven National Laboratory. Since 2012, the injector system gradually moves to the commissioning stage. It occurs after group people efforts on optics design, equipment specifications, construction and tests, assembly, installation and alignment. It is very important and exciting. To make the commissioning smooth and efficient, an important effort was put on the sub-system integration test to make sure the device function along with utility, timing system and control system, to calibrate diagnostics system and to debug high level application with simulated beam signals and required hardware. In this paper, we report our integration test experience and related control system software development.  
 
THPME029 Design of NSLS-II Booster Dipoles with Combined-function Magnetic Field 3570
 
  • S.V. Sinyatkin, A.N. Dubrovin, S.M. Gurov, E.B. Levichev, Yu.A. Pupkov, E.R. Rouvinsky, A.V. Sukhanov
    BINP SB RAS, Novosibirsk, Russia
 
  Focusing and defocusing dipoles magnets of NSLS-II 3 GeV booster are designed, manufactured and measured in BINP, Russia. The magnets should provide the booster operation at energy from 170 MeV to 3.15 GeV with a 2 Hz frequency. Because of booster compactness the dipoles have quadrupole and sextupole components and should create high quality of field of ± 2·10-4 in region of ± 2 cm. In this paper the design and results of 2D and 3D simulation are presented.  
 
THPME030 Magnetic Measurement Results of the NSLS-II Booster Dipole Magnets 3573
 
  • S.V. Sinyatkin, G.N. Baranov, A.M. Batrakov, P.N. Burdin, D.B. Burenkov, S.M. Gurov, V.A. Kiselev, V.V. Kobets, E.B. Levichev, I.N. Okunev, A. Polyansky, Yu.A. Pupkov, L.E. Serdakov, P. Vobly
    BINP SB RAS, Novosibirsk, Russia
 
  Focusing and defocusing dipole magnets for NSLS-II 3 GeV booster are designed, manufactured and measured in BINP, Russia. Magnetic measurements of 32 BD and 28 BF magnets are made by BINP. In this paper the results of magnetic measurements of dipoles magnets in the field area of 0.638 – 11.829 kGs for BD type and 0.260 - 4.829 kGs for BF type are given. Analysis and comparison with magnetic field simulation are made.