TUPFI013 LHC Long Shutdown: A Parenthesis for a Challenge 1355
 
  • K. Foraz, M. Arnaud, M.B.M. Barberan Marin, C. Bedel, M. Bernardini, J. Coupard, J. Etheridge, H. Gaillard, S. Grillot, E. Paulat, A.-L. Perrot
    CERN, Geneva, Switzerland
 
  After three fruitful years of operation, the LHC will enter a long shutdown. Major works will be implemented to allow running safely at 7TeV/beam. The LHC superconducting circuits will be consolidated; mitigation measures will be carried out to reduce the single event effects occurrence in the frame of the Radiation To Electronics mitigation project (R2E); all the equipment will be fully maintained. In parallel, numerous consolidation and upgrade activities will be performed all around the 27km ring. The schedule has been optimized in order to reduce the length of the shutdown (LS1) to 22 months (including hardware commissioning). The organization of the works is therefore essential to ensure a safe and reliable plan. This paper introduces the various activities to be performed and presents the schedule and the preparation process, including the operational safety aspects.  
 
THPFI055 First Year of Operations in the HiRadMat Irradiation Facility at CERN 3415
 
  • A. Fabich, N. Charitonidis, N. Conan, K. Cornelis, D. DePaoli, I. Efthymiopoulos, S. Evrard, H. Gaillard, J.L. Grenard, M. Lazzaroni, A. Pardons, Y.D.R. Seraphin, C. Theis, K. Weiss
    CERN, Geneva, Switzerland
  • N. Charitonidis
    EPFL, Lausanne, Switzerland
 
  HiRadMat (High Irradiation to Materials) is a new facility at CERN constructed in 2011, designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies can be tested. The facility uses a 440 GeV proton beam extracted from the CERN SPS with a pulse length of 7.2 μs, to maximum pulse energy of 3.4MJ. For 2012, the first year of operations of the facility, nine experiments were scheduled and completed data-taking successfully. The experience gained in operating this unique facility, along with highlights of the experiments and the instrumentation developed for online measurements are reported.